The Elkhart River Erosion Control Project was recently completed in Ligonier.  The reconstruction of a collapsed retaining wall approximately 275 feet long was part of a Disaster Recovery project. The project included construction of a retaining wall/bank stabilization system along the Elkhart River, reconstruction of the ally, and installation of a guardrail system along the river bank.  

Bank Stabilization along the Elkhart River between 3rd Street and Pigeon Street, east of Cavin Street, Ligonier.